CLIENT
University of Nebraska Medical Center
WORK PERFORMED
– Salvaging & Recycling
– Building Structure Demolition
UNMC Monroe Meyer Institute
- 100% recycled and re-used materials
- 8” to 12” thick concrete slabs and decks
- 18” to 48”. thick concrete walls
- Zero injuries reported during the project
- Completed ahead of schedule and on budget
- 5,000 lbs. to 165,000 lbs. equipment used to demolish the building
- Top-down demolition method used