AMG was contracted to demolish two, 84,000 SF steel structures in La Jolla California. Each building was salvaged, stripped, and gutted of all deleterious debris prior to structural building demolition. AMG used multiple skidsteers, loaders, and hydraulic excavators equipped with shears, breakers, pulverizers, and thumb attachments to remove all the building structures and their foundations working six-day work weeks and finishing in six weeks time.